|
Becton Waterfront, London |
| Type of Works | Area | Contract Period | | Safety netting to new roof areas by MEWPs | 40,300m² | 9 Months | | Temporary edge protection to new roof areas by MEWPs | 2,500m | | | Haki Access Towers | 8 x 12m | |
http://www.mclarenconstruction.co.uk/casestudy/6/62/beckton-waterfront--london.html HASL supplied safety nets, bespoke edge protection systems and Haki access towers to 8 units on Becton Waterfront in London. HASL designed and certified a Temporary Edge Protection System to BS EN 13374 Class A which provided the client with a system that could be left installed without preventing the side wall cladding progressing. ... ... ... ... ... |