Redland Green Park, Reading

Type of WorksArea Contract Period
Replacement of signage by rope access2 x masts4 weeks

HASL were contracted in to assist the design company in remedial works to the Redland Green Park signature masts.  Suggested access methods were the use of a 50m lorry mount 26 tonne access machine which would give access to 60% of the signage for remedial works, the other 40% could be accessed by abseiling from the truck mount to the working position.  This high impact method also required full lane closure of a busy A-road at peak times of the day. 

 

HASL removed the illuminated signage without need for disruption to an already congested area by utilising rope access procedures.   Our solution was to utilise a simple but effective prussik loop of cord and climb up the cables to the working area where ropes could be installed to allow access to the whole structure.   HASL refitted all signage and completed the electrical connections with all work was able to be carried out with minimum impact, reduced timescales and provided a subtsantial cost reduction.

Redland Green Park
...
Redland Green Park
...
Redland Green Park
...
Redland Green Park
...
Redland Green Park
...
Redland Green Park