The Energy Centre, Sheffield

Type of WorksAreaContract Period
Safety netting to new roof areas by rope access7,500m²13 Months
Temporary edge protection900m
 
Rope access works: cladding, steel fixing  

http://www.veoliaenvironmentalservices.co.uk/sheffield/pages/thefacts.asp

HASL supplied mansafe roof safety nets, Temporary Edge Protection to EN 13374 Class C  'Combisafe Net Barrier' and completed various rope access works on the Energy Centre, Sheffield.  The Energy Centre consists of 10 multi level roofs up to a height of 50m from ground level.   This multi level roof  meant Rope Access was the only solution to complete the safety system. The use of Combisafe net barrier system had not been used on such large eaves details of up to 3.5m and had also not been installed by rope access at this height or complexity before.

Using rope access techiques, HASL also undertook complex structural steelwork installations, concrete cutting and also completed cladding works to various areas of the building.

The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield
...
The Energy Centre Sheffield