High Access Solutions Practical guidance for working safely at height

High Access Solutions

Practical guidance for working safely at height

Latest Articles

Beyond the Barrier Tape: Engineering Defensible Exclusion Zones for Dropped Objects
Safety & Compliance

Beyond the Barrier Tape: Engineering Defensible Exclusion Zones for Dropped Objects

Barrier tape and a warning sign are not a dropped-object control; they are a prompt. This article explains how to calculate realistic exclusion zones, brief and enforce them, and audit the arrangements on occupied and public-facing UK sites.

Plugging the Gap: Planning Electric MEWP Charging on Constrained Sites
Equipment & Plant

Plugging the Gap: Planning Electric MEWP Charging on Constrained Sites

Battery-electric powered access can cut emissions and noise, but only if charging is planned as seriously as the lift itself. This guide sets out load checks, charging windows, temporary supply options and battery care for UK sites with limited electrical capacity.

Between the Bollards and the Bus Stop: Running Powered Access on a Working High Street
Safety & Compliance

Between the Bollards and the Bus Stop: Running Powered Access on a Working High Street

A retail frontage compresses every hazard of access work into a few metres of pavement. This practical guide sets out how to plan MEWP set-up, exclusion zones and timed works so that trading, deliveries and public movement carry on around you without anyone walking into the risk.

Say It Every Shift: Turning Familiarisation Into a Site-Specific MEWP Handover
Equipment & Plant

Say It Every Shift: Turning Familiarisation Into a Site-Specific MEWP Handover

Manufacturer familiarisation tells an operator how the machine works. It says nothing about this ground, this exclusion zone or this rescue arrangement. Here is the case for a short, repeatable supervisor briefing before the first ascent of every shift, and the words to deliver it.

Equipment & Plant

The Hire Agreement Health Check: Contractual Pitfalls in Powered Access Procurement

A competitive day rate can conceal contractual obligations that fall to the hirer long before the first machine leaves the depot. This checklist helps facilities managers compare powered access hire terms on inspection, breakdown cover, familiarisation and end-of-hire condition, not price alone.

Roof Access by Default: Managing Fragile Surfaces in Light Industrial Premises
Safety & Compliance

Roof Access by Default: Managing Fragile Surfaces in Light Industrial Premises

Light industrial units often treat roof access as an occasional exception, yet maintenance tasks arrive with little warning and improvised access becomes normal. A proportionate plan for fragile surfaces, hidden voids and short-duration work is essential.

When the Cabinet Is the Hazard: Rethinking Fall Arrest Kit Storage and Inspection
Safety & Compliance

When the Cabinet Is the Hazard: Rethinking Fall Arrest Kit Storage and Inspection

Fall arrest harnesses, lanyards and rescue kits are often stored in damp plant rooms or shared cabinets where inspection tags go missing and condition is assumed rather than verified. This practical guide sets out a storage, pre-use and periodic inspection regime that facilities managers can apply before anyone clips on.

Equipment & Plant

Before the First Boot Hits the Boards: A 2026 Scaffold Handover Audit for Facilities Teams

Most scaffold problems are visible before the first operative climbs the standard, yet handovers are often treated as a signature rather than an inspection. This facilities manager's pre-load checklist covers design documentation, TG20 compliance, edge protection, ties, loading bays and emergency arrangements, with practical ways to challenge incomplete handovers without derailing the programme.

Beyond the Lanyard: Closing the Rescue Gap in UK Work-at-Height Planning
Safety & Compliance

Beyond the Lanyard: Closing the Rescue Gap in UK Work-at-Height Planning

Fall prevention dominates most work-at-height plans, yet rescue after a fall is a separate legal and practical duty. This article sets out how UK facilities managers can test their rescue arrangements, from equipment compatibility to scenario-based training, and avoid the assumptions that leave sites exposed.

The False Economy of the Old MEWP: Seven Audit Triggers for 2026
Equipment & Plant

The False Economy of the Old MEWP: Seven Audit Triggers for 2026

Ageing MEWPs can look cheap on the balance sheet while quietly consuming budget through downtime, parts and compliance risk. This seven-point audit framework helps UK contractors and facilities managers decide whether to repair, replace or retire access equipment in 2026.

Cold Snap, High Stakes: A Winter Assurance Framework for Work at Height
Safety & Compliance

Cold Snap, High Stakes: A Winter Assurance Framework for Work at Height

Winter conditions alter the risk profile of every access task, from pre-use inspection to emergency retrieval. This framework helps UK facilities managers and contractors test their arrangements before cold weather exposes gaps. It focuses on practical controls, clear stop rules and equipment choices that suit short daylight and low temperatures.

The Right Platform for the Job: A Contractor’s Framework for Access Equipment Choice
Equipment & Plant

The Right Platform for the Job: A Contractor’s Framework for Access Equipment Choice

Scaffolding, MEWPs and mast climbing work platforms each solve a different access problem, and the cheapest headline rate is rarely the whole cost. This guide sets out a decision framework for UK contractors balancing safety, programme and compliance. It covers ground conditions, training and inspection at the selection stage.